7475 McLean Road East - Puslinch, ON

March 7, 2025

Blue-Con Construction partnered with Cooper Construction to complete extensive civil works for the 40-acre LEED Silver-certified site development at 7475 McLean Road East. The project involved the demolition of existing underground infrastructure and the re-engineering of approximately 510,000m³ of sub-base material to support two 419,250 square foot buildings. Site servicing included the installation of over 2.5 km of storm, sanitary, and watermain infrastructure. Additionally, more than 215,000 metric tonnes of imported granular material—equating to approximately 10,000 truckloads—was placed to support the site’s construction requirements.


Project Value:  $7,000,000

Location: Puslinch, Ontario

SECTOR:  Private

Service Provided: Site Preparation & Removals, Site Servicing, Earthworks
Project Reference: Cooper Construction


Regent Street Reconstruction
Blue-Con Construction is your professional partner for heavy civil construction.
bluecon.on.ca
RECENT NEWS + PROJECT

OUR WORK IN ACTION

An aerial view of a building and a road
March 12, 2025
Blue-Con Construction partnered with Cooper Construction to complete the civil works for the Grand River Business Park located in Kitchener, Ontario. A building spanning over 363,000 SF. This project featured site servicing, earthworks, and a large stormwater management pond located at the back of the property.
Two construction workers are working on a construction site in front of a brick building.
March 11, 2025
Working alongside EllisDon and Modern Niagara, Blue-Con Construction played a key role in the earthworks for the first phase of Fanshawe College’s Campus Energy Centre (CEC), a groundbreaking initiative to modernize campus energy infrastructure. This phase introduced a state-of-the-art chilled water facility, supporting the College’s goal to reduce greenhouse gas emissions by 50% below 2013 levels by 2050. Blue-Con’s expertise in excavation and site preparation enabled the seamless installation of underground infrastructure, including over 1.5 km of pre-insulated piping. Learn more about this project in this building.ca article >
A bunch of yellow pipes are sitting on top of a gravel road.
March 11, 2025
In 2023, Blue-Con Construction partnered with Sierra Construction on the Woodstock Soprema project. This job involved a full civil package, including site prep, earthworks, and servicing. To optimize costs and sustainability, Blue-Con proposed using an on-site borrow pit to reduce the need for imported fill, lowering expenses and minimizing the project's carbon footprint. Additionally, Blue-Con provided Value Engineering recommendations to the general contractor and owner, leading to a more efficient retaining wall design and further cost savings.